Excavator and heavy construction equipment loaded for jobsite transport
Construction Equipment Transportation

Heavy Haul Transportation for Construction Equipment & Projects

Excavators, dozers, cranes, pavers, and structural components relocated for general, civil, highway, and infrastructure contractors, sequenced to the build schedule, not the load board.

  • Jobsite To Jobsite Relocation
  • Oversize Load Permitting
  • Multi State Coverage
FMCSA Licensed
Carrier Verified
Insurance Verified
Route Survey Complete
Permits Coordinated
Cargo Protected
Nationwide Coverage
Heavy Haul Specialists
Data Center Logistics
Single Point Accountability
FMCSA Licensed
Carrier Verified
Insurance Verified
Route Survey Complete
Permits Coordinated
Cargo Protected
Nationwide Coverage
Heavy Haul Specialists
Data Center Logistics
Single Point Accountability
Industry Overview

Equipment That Isn't On Site Is Costing You Money

Construction schedules are built around machine hours. When a dozer sits on the wrong yard or a crane arrives after the pick window, the cost is measured in idle crews rather than freight dollars. Equipment moves also involve real dimensional risk, track widths, boom sections, and counterweights routinely put a machine over legal width, height, or weight.

Bear Down Logistics handles construction moves with the machine specifications in hand: transport dimensions with attachments removed, tie down points, ground clearance, and loading method. Permits and routes are built from those numbers, and delivery is sequenced around your site access and crew schedule.

Machines Over Legal Dimensions

Width, height, and weight are calculated in transport configuration so the permit matches the actual load.

Jobsite Access

Ground conditions, turning radii, and unloading space are verified before a lowboy is dispatched.

Tight Relocation Windows

Moves are scheduled between phases so machines land when the crew is ready to run them.

Loading Without Damage

Ramp angle, deck height, and tie down requirements are confirmed to protect undercarriage and hydraulics.

What We Transport

Construction Equipment We Transport

Single machine relocations through full fleet moves for contractors, dealers, and rental companies.

Excavators

Compact through large class machines, with boom and counterweight handling.

Bulldozers

Track dozers moved on RGN and multi axle lowboy configurations.

Cranes

Rough terrain, all terrain, and crawler crane components with counterweights.

Pavers & Milling Machines

Asphalt pavers, mills, and screeds moved between highway phases.

Loaders

Wheel loaders, skid steers, and track loaders.

Drilling Equipment

Foundation drills, augers, and pile driving equipment.

Concrete Equipment

Batch plant components, pumps, and placing booms.

Bridge Components

Girders, beams, and precast sections on extendable equipment.

Structural Components

Structural steel, columns, and fabricated assemblies.

Specialized Heavy Haul Capabilities

Capabilities For Construction Freight

  • Oversized Loads
  • Overweight Loads
  • Specialized Trailers
  • Route Surveys When Required
  • Permitting Coordination
  • Escort Coordination
  • Equipment Relocation Programs
  • Multi State Transportation
  • Jobsite Delivery
  • Nationwide Freight Coordination
How We Manage Your Project

Five Steps, One Accountable Team

  1. 01

    Project Review

    We confirm make, model, transport dimensions, weight, and whether attachments ship separately.

  2. 02

    Equipment & Route Planning

    Trailer type and deck height are matched to the machine, and the route is checked for restrictions.

  3. 03

    Permitting & Coordination

    Oversize permits, travel restrictions, and escorts are arranged for every state on the route.

  4. 04

    Transportation

    Loading is supervised or confirmed, and the move is tracked to the receiving site.

  5. 05

    Delivery & Site Coordination

    Delivery is timed to site access and crew availability so the machine goes straight to work.

Why Bear Down Logistics

Why Contractors Keep Our Number

Contractors don't need a quote machine. They need someone who answers, knows what a machine actually measures on a deck, and gets it there before the crew shows up.

Machine Specific Planning

Equipment matched to real transport dimensions, not a generic weight class.

Schedule Ownership

Once we lock in, we're locked in on the date your phase depends on.

Fleet Move Capacity

Single machines or multi unit relocations coordinated as one project.

Straight Communication

We don't sell freight. We sell certainty. You get status you can plan crews around.

FAQ

Heavy Construction Heavy Haul Questions, Answered

Do you move equipment between active jobsites?

Yes. Jobsite to jobsite relocation is one of our most common construction moves, scheduled around your phase transitions.

Can you handle over width machines?

Yes. Over width, over height, and overweight machines are moved under permit with escorts arranged where required.

Do I need to remove attachments?

It depends on the machine and route. We calculate the loaded envelope and tell you up front whether buckets, booms, or counterweights should ship separately.

Can you support equipment dealers and rental fleets?

Yes. We coordinate recurring dealer and rental deliveries, including multi unit moves on a fixed schedule.

Request A Quote

Tell Us About Your Shipment

Send your equipment details and our team will prepare a transportation plan and quote.

01Equipment Capture
JPG · PNG · PDF
02Shipment Data
03Consent & Authorization

By submitting, dispatch reviews your shipment request within approximately 15 minutes during business hours.

Avg. response · 15 min · Dispatch reviews every submission
Transportation Review

Have Specialized Freight That Needs To Move?

Tell us what you're moving, where it's going, and when it needs to arrive. Our team will evaluate the shipment and develop a transportation strategy around your project.